Electrical Installations – IRAQ, Badra CPF Phase 2 Project

Project Info

  • Construction Date

    20th, Dec, 2015 to 31st, March, 2017

  • Category

    Ongoing Projects

  • Client Name

    Samsung Engineering/Gazprom Neft Badra

  • Project Location

    Badara Oilfield – Wasit, Iraq

  • Current Progress

    93%

Project Information

Al Dar International has been contracted to execute all the Electrical works at the Central Processing Facility Phase 2, Badra Oil Field, Iraq.

IMG_6667

Scope of Work


The work includes but not limited to;

  • Installation and Commissioning of Diesel Generator Set.
  • Power Transformer (132/33kv,33/11kv,11/0.4kv,)
  • EHV GIS panel.
  • LV Power Distribution Panel.
  • LV Switchgear and MCC Panel.
  • MV Switchgear Panel.
  • Installation of Battery Packages
  • NGR and VSD Panel.
  • Power Capacitor System, Power Monitoring System , SCADA PMS/ECS
  • Bus duct Systems (indoor and outdoor)
  • Power System (Cable tray, Cable pulling LV &HV (1.5mm2 to 630mm2), Glanding and Termination
  • Installation of Fiber Optic Cables
  • CCTV Systems
  • Communication Systems (Paging, P/A, Wireless Radio)
  • Grounding System
  • Fire Alarm System
  • Telephone System
  • Lighting System