Instrumentation Works – IRAQ, Badra CPF Phase 2 Project

Project Info

  • Construction Date

    20th, December, 2015 to 31. March, 2017

  • Category

    Ongoing Projects

  • Client Name

    Samsung Engineering/Gazprom Neft Badra

  • Project Location

    Badra Oilfield – Wasit, Iraq

  • Current Progress

    97%

Project Information

Al Dar International has been contracted to do on for the  Instrumentation Works for the Central Processing Facility Phase 2 at Badra Oil Field, Iraq.

IMG_7815

Scope of Work

Supply of Manpower, Equipment, Tools, installation and Pre commissioning of all instrumentation work. The Work will include but not limited to;

  • Analyzer Common Cabinet
  • Cable Tray and Fittings, Ladder and Straight
  • DCS, EWS, HIS (OWS), Marshaling Panel, Network Panel, PIMS
  • ESD, EWS, Marshaling Panel, System Panel
  • Fire and Gas Panel
  • Flame Detector, UV/IRIMG_8107
  • Flow Gauge Panel
  • Flow TransmitterGas Detector – Combustible
  • Instrument Cable (Different Sizes)
  • Junction Box
  • Level Gauge, Level Transmitter
  • Metering System
  • Loop Test
  • Metering EWS
  • MMS, EWS/MCS
  • MMS Panel
  • Temperature Gauge, Transmitter, Indicator
  • Pressure Transmitter, Pressure Gauge
  • Process Stream Analyzer
  • Control Valves
  • PLC Panel
  • All Tubing and Conduits Works
  • Calibration Services

IMG_7359IMG_3543