Mechanical Installations – IRAQ, Badra CPF Phase 2 Project

Project Info

  • Construction Date

    20th, December, 2015 to 30th, June, 2017

  • Category

    Ongoing Projects

  • Project Location

    Badra Oilfield - Wasit Iraq

  • Client

    Samsung Engineering/Gazprom Neft Badra

Project Information

Al Dar International has been contracted to do Mechanical Equipment installation for the Central Processing Facility 2 at Badra Oil Field, Iraq.

IMG_3354

Scope of Work

  • Installation of Rotating Equipment (High/Medium  Gas Compressor (6 Units), Horizontal & Centrifugal Pumps, Electrical Crane, Chemical Injection Units, TEG Refrigeration Package).
  • Installation of Stationary Equipment (Vessels, Drums, Columns, Heat Exchangers, Filters).
  • Fabrication and Installation of Storage Tanks.
  • Hydrostatic Testing and Cleaning Services.