Fire Fighting System works – IRAQ, Badra CPF Phase 2 Project

Project Info

  • Construction Date

    27th, February, 2015 to 31, March, 2017

  • Category

    Ongoing Projects

  • Client Name

    Samsung Engineering/Gazprom Neft Badra

  • Project Location

    Badra Oilfield – Wasit, Iraq

  • Current Progress

    100%

Project Information

Al Dar International have been contracted for Supply and Installation of Fire fighting System at the Central Processing Facility Phase 2 – Badra Oil Field, Iraq.

IMG_4856

 

Scope of Work

Supply the Materials, Manpower, Equipment and Tools for installation of Fire Fighting, Piping Works and FM 200 Systems at Central Processing Facility Phase 2 at Badra, Iraq.

The works include but not limited to;

  • Supplying, Fabrication and Installation of all the Piping Steel support
  • Supply of all the Pipes, Fittings & Valves
  • Fabrication, Sand Blasting & Painting of all the fabricated spools
  • Erection & Installation of all the piping Spools & Valves at the crude oil tanks and other facilities.
  • Pre-Commissioning  works by completing the Hydrotest & Pneumatic Test for the Fire Fighting System & FM 200 System.
  • Installation of all the FM 200 Fire Suppression System Equipment, Cabinet and Connecting it to the other piping Systems.