Piping Works – IRAQ, Badra CPF Phase 2 Project

Project Info

  • Construction Date

    28th, February, 2015 to 31, March, 2017

  • Category

    Ongoing Projects

  • Client Name

    Samsung Engineering/Gazprom Neft Badra

  • Project Location

    Badra Oilfield – Wasit, Iraq

  • Current Progress

    100%

Project Information

Al Dar International has been contracted to Provide Piping Works for the Central Processing Facility phase 2 at Badra Oil Field, Iraq.

photo_2016-08-14_14-43-59

 

Scope of Work


  • Custom Pipe Fabrication (Shield Metal Arc Welding (SMAW), Gas Tungsten Arc Welding (GTAW) & Plasma Cutting)
  • Fabrication and Installation of Piping Systems (CS, SS, Alloy Steel)
  • Installation of Pipeline
  • Fabrication and Installation of Wellhead and Manifold Systems
  • Compressor and Pump Station Construction
  • Meter and Regulator Station Construction
  • Launcher and Receiver Fabrication and Installation
  • Turn-around Services
  • Hot tapping Services
  • Installation of Valves and Other Piping Elements
  • Sandblasting, Panting and Coating Services
  • NDT
  • Hydro Testing Services
  • Pigging and Cleaning Services
  • Flange Torqueing and Bolt Tensioning
  • Installation of GRP Piping and Fittings
  • Installation of HDPE, PE Piping and Fittings
  • Cathodic Protection Services