Modular Building Installation – DS7 Water Injection System

Project Info

  • Construction Date

    September 2015

  • Category

    Completed Projects

Scope of Work


Installation of prefabricated steel structural building for LCR. The project is located in WQ1, the work includes but not limited steel structure installation, electrical work, cable try installation, HVAQ system installation, G&F system.