Fire Fighting System works – IRAQ, Badra CPF Phase 2 Project

Project Information

Al Dar International have been contracted for Supply and Installation of Fire fighting System at the Central Processing Facility Phase 2 – Badra Oil Field, Iraq.

IMG_4856

 

Scope of Work

Supply the Materials, Manpower, Equipment and Tools for installation of Fire Fighting, Piping Works and FM 200 Systems at Central Processing Facility Phase 2 at Badra, Iraq.

The works include but not limited to;

  • Supplying, Fabrication and Installation of all the Piping Steel support
  • Supply of all the Pipes, Fittings & Valves
  • Fabrication, Sand Blasting & Painting of all the fabricated spools
  • Erection & Installation of all the piping Spools & Valves at the crude oil tanks and other facilities.
  • Pre-Commissioning  works by completing the Hydrotest & Pneumatic Test for the Fire Fighting System & FM 200 System.
  • Installation of all the FM 200 Fire Suppression System Equipment, Cabinet and Connecting it to the other piping Systems.

 

GTG Works – IRAQ, Badra CPF Phase 2 Project

IMG_20160625_070934

Project Information

Al Dar International has been contracted for installation of 5 Gas Turbine Units with Total capacity of 125MW for the Central Processing Facility Phase 2 Project at Badra Oil Field, Iraq. The scope of Work including but not Limited to Installation of Mechanical, Electrical, Instrument and interconnection Piping, with all related Pre-commissioning Work;

  • Preparation of Civil Works (Chipping and Padding)
  • Installation of generators/Gas Turbine, LOM, Stacks, Cooler fans and all related equipment and Pumps
  • First Alignment
  • Final Alignment
  • Pre Commissioning
  • Start up And Commissioning

 

Power Generation Sets


  • Gas Turbine
  • Lube Oil Module (Oil Tank + Gear)
  • Generator
  • Gas Turbine Enclosure
  • Control Compartment – 1
  • Control Compartment – 2
  • Generator Aux Cubicle
  • CO2 Fire Fighting container
  • Compressor Water Washing Pump Skid
  • Miscellaneous
  • Inlet air System
  • Exhaust System
  • Stack
  • Lube Oil Cooler
  • Lube Oil Mist Separator
  • Bearing Cooling Fan

 

Piping Works – IRAQ, Badra CPF Phase 2 Project

Project Information

Al Dar International has been contracted to Provide Piping Works for the Central Processing Facility phase 2 at Badra Oil Field, Iraq.

photo_2016-08-14_14-43-59

 

Scope of Work


  • Custom Pipe Fabrication (Shield Metal Arc Welding (SMAW), Gas Tungsten Arc Welding (GTAW) & Plasma Cutting)
  • Fabrication and Installation of Piping Systems (CS, SS, Alloy Steel)
  • Installation of Pipeline
  • Fabrication and Installation of Wellhead and Manifold Systems
  • Compressor and Pump Station Construction
  • Meter and Regulator Station Construction
  • Launcher and Receiver Fabrication and Installation
  • Turn-around Services
  • Hot tapping Services
  • Installation of Valves and Other Piping Elements
  • Sandblasting, Panting and Coating Services
  • NDT
  • Hydro Testing Services
  • Pigging and Cleaning Services
  • Flange Torqueing and Bolt Tensioning
  • Installation of GRP Piping and Fittings
  • Installation of HDPE, PE Piping and Fittings
  • Cathodic Protection Services

IMG_0502 - Copy

Instrumentation Works – IRAQ, Badra CPF Phase 2 Project

Project Information

Al Dar International has been contracted to do on for the  Instrumentation Works for the Central Processing Facility Phase 2 at Badra Oil Field, Iraq.

IMG_7815

Scope of Work

Supply of Manpower, Equipment, Tools, installation and Pre commissioning of all instrumentation work. The Work will include but not limited to;

  • Analyzer Common Cabinet
  • Cable Tray and Fittings, Ladder and Straight
  • DCS, EWS, HIS (OWS), Marshaling Panel, Network Panel, PIMS
  • ESD, EWS, Marshaling Panel, System Panel
  • Fire and Gas Panel
  • Flame Detector, UV/IRIMG_8107
  • Flow Gauge Panel
  • Flow TransmitterGas Detector – Combustible
  • Instrument Cable (Different Sizes)
  • Junction Box
  • Level Gauge, Level Transmitter
  • Metering System
  • Loop Test
  • Metering EWS
  • MMS, EWS/MCS
  • MMS Panel
  • Temperature Gauge, Transmitter, Indicator
  • Pressure Transmitter, Pressure Gauge
  • Process Stream Analyzer
  • Control Valves
  • PLC Panel
  • All Tubing and Conduits Works
  • Calibration Services

IMG_7359IMG_3543

 

Electrical Installations – IRAQ, Badra CPF Phase 2 Project

Project Information

Al Dar International has been contracted to execute all the Electrical works at the Central Processing Facility Phase 2, Badra Oil Field, Iraq.

IMG_6667

Scope of Work


The work includes but not limited to;

  • Installation and Commissioning of Diesel Generator Set.
  • Power Transformer (132/33kv,33/11kv,11/0.4kv,)
  • EHV GIS panel.
  • LV Power Distribution Panel.
  • LV Switchgear and MCC Panel.
  • MV Switchgear Panel.
  • Installation of Battery Packages
  • NGR and VSD Panel.
  • Power Capacitor System, Power Monitoring System , SCADA PMS/ECS
  • Bus duct Systems (indoor and outdoor)
  • Power System (Cable tray, Cable pulling LV &HV (1.5mm2 to 630mm2), Glanding and Termination
  • Installation of Fiber Optic Cables
  • CCTV Systems
  • Communication Systems (Paging, P/A, Wireless Radio)
  • Grounding System
  • Fire Alarm System
  • Telephone System
  • Lighting System

IMG_7298

Mechanical Installations – IRAQ, Badra CPF Phase 2 Project

Project Information

Al Dar International has been contracted to do Mechanical Equipment installation for the Central Processing Facility 2 at Badra Oil Field, Iraq.

IMG_3354

Scope of Work

  • Installation of Rotating Equipment (High/Medium  Gas Compressor (6 Units), Horizontal & Centrifugal Pumps, Electrical Crane, Chemical Injection Units, TEG Refrigeration Package).
  • Installation of Stationary Equipment (Vessels, Drums, Columns, Heat Exchangers, Filters).
  • Fabrication and Installation of Storage Tanks.
  • Hydrostatic Testing and Cleaning Services.

IMG_6326