Line Polyethylene Water Pipeline Network 14 Tamoz Street

Project Info

  • Construction Date

    June 2009

  • Category

    Completed Projects

Description of Work


Line Polyethylene Water Pipeline Network in the 14 Tamoz Street, size 500mm and 450mm.

Client:  Basra Water Directorate

Location:  Basra, Iraq

Year of Construction: 2009 – 2010