Badra CPF 2-Project – Electrical Works

Project Info

  • Construction Date

    15th January 2016 to June 2017

  • Category

    Ongoing Projects

  • Client Name

    Samsung Engineering

  • Project Location

    Badara Oilfield – Wasit, Iraq

  • Current Progress

    9%

Project Information

Al Dar International has been contracted to do Electrical Installation for the Central Processing Facility 2 at Badra Oil Field, Iraq.

 

Scope of Work


The electrical installation involved the following activities:

  • Development of detailed engineering as required.
  • Definition of exact location of bulk equipment, cable routing, actual cable lengths,
  • Location, shape and dimensions, of supports and bracket for cable trays, cables, conduit non itemized equipment, junction boxes, etc.
  • Installation of the following Equipment:
    • Emergency Diesel Generator, (B) H.V & L.V Switch board & MCC/Lighting/Auxiliary
    • Panel, (C) Transformer/Capacitor/GIS ,( D) Battery & Charger/UPS
  • Installation of the following Apparatus:
    • Laying of cables for more than 1.5 million meters with all termination and glanding as required.
    • Lighting fixture:
      • Weather Proof/Explosion Proof, (b) Indoor (in building general purpose type)
      • Push button station
      • Weather Proof/Explosion Proof, (b) Indoor (in building(
      • Receptacle
      • Weather Proof/Explosion Proof (b) Indoor (in building general purpose type)
    • Communication System – Paging and set/Amplifier/Speaker/Public Address/Computer Network
    • Fire Alarm System, and other activities.