Badra CPF 2-Project – Mechanical Works

Project Info

  • Construction Date

    15th January 2016

  • Category

    Ongoing Projects

  • Project Location

    Badara Oilfield - Wasit Iraq

  • Client

    Samsung Engineering

Project Information

Al Dar International has been contracted to do Mechanical Equipment installation for the Central Processing Facility 2 at Badra Oil Field, Iraq.

Scope of Work


The project included and not limited to:

Rotating Equipment
  1. Gas Compressor installation
  2. Gas turbine Installation
Stationary Equipment
  1. TEG Contactor Column.
  2. Installation of Columns.
  3. Installation Different size of pumps.
  4. Installation of different size of heat exchangers.
  5. Installation of different size of vessels.