ME&I at Khor Azubair Gas Unit
Scope of Work in KAZ area was as follows:
- Installation and hook-up of gas treatment facility.
- Erection of ME&I equipment and structures
- Tie-ins in gas treatment facility existing
- Interconnecting to gas treatment facility
- Installation of power and control cables.
Client: KBR
Location: Khor Azubair/Basra/Iraq
Year of Construction: 2007 – 2008
Scope of Work in KAZ area was as follows:
- Installation and hook-up of gas treatment facility.
- Erection of ME&I equipment and structures
- Tie-ins in gas treatment facility existing
- Interconnecting to gas treatment facility
- Installation of power and control cables.
Client: KBR
Location: Khor Azubair/Basra/Iraq
Year of Construction: 2007 – 2008