Operation and Maintenance Contracts for Badra Oil Field

Operation and Maintenance Contracts for Badra Oil Field


Operation and Maintenance Contracts for Badra Oilfield

Provisions of competent, experienced and a professional manpower and equipment/vehicle as further described in this scope of service to support:

  • Pre commissioning
  • Commissioning
  • Maintenance
  • Shutdown activities

 

Air Blowing and Chemical Cleaning – FCP Gas Train 1 and 2

Scope of Work


The below described scope of work is for Train 1 only. Train 2 scope of work currently is not fully clear. Once SOLAR packages arrive from Houston and cleanliness inspections have been completed, Work-packs shall be generated by COMPANY and will be submitted to Subcontractor for executions using the same unit rates as defined for Train.

Air Blowing


A Boroscope exercise was carried out on skids delivered from Houston, process skids and pipe rack modules. The findings, minor debris and scaling, deem it necessary to perform air blowing as per the following work packs:

  • Work Pack no. 1 – Instrument Air
  • Work Pack no. 2 – 1st Stage Filter Sep
  • Work Pack no. 3 – 1st Stage Discharge Coolers
  • Work Pack no. 4 – 2nd Stage Compression.
  • Work Pack no. 5 – 2nd Stage Discharge Cooler
  • Work Pack no. 6 – Station Recycle
  • Work Pack no. 7 – FG/SG Pipework
  • Work Pack no. 8 – FG/SG Skid
  • Work Pack no. 9 – FGC Skid
  • Work Pack no. 10 – Turbine Utility Skid

Air Blowing will be carried out as per the referred procedure “FCP Gas Train 1 Cleanliness” (Doc. no. GAS1-GP1-SIP-MP-6025-0001). Subcontractor shall supply all manpower, consumables, tools, plant and equipment to execute air blowing works.

Chemical Cleaning


In addition to the air blowing it has been decided that chemical cleaning should be carried out on the following systems as per the referred marked-up P&IDs

  1. System : Material
  2. Fuel Gas : Stainless Steel & Carbon Steel
  3. Seal Gas : Stainless Steel
  4. N2 : Stainless Steel

Mechanical Cleaning for Static Equipment at KAZ Plant

Scope of Work


The SOW for this project is contained but not limited to complete this tasks:

Dismantling of existing piping, equipment, exchangers, heaters for mechanical cleaning and re-installation work. The work includes mechanical works, purging, hydro testing, and fabrication for some items.

 

Modular Building Installation – DS7 Water Injection System

Scope of Work


Installation of prefabricated steel structural building for LCR. The project is located in WQ1, the work includes but not limited steel structure installation, electrical work, cable try installation, HVAQ system installation, G&F system.

 

Modular Building Installation – MOD

Scope of Work


Installation of prefabricated steel structural buildings for LCR, LER, guard house and four guard towers each one consisting of three stories.

The project is located in WQ1, the work includes but not limited to steel structure installation, electrical work, cable try installation, HVAQ system installation, G&F system.

 

E&I Works Slug Catcher Project

Scope of Work


Electrical and Instrumentation Work (cable laying, cable tray & cable support installation, cable termination, instumentation works).

 

HVAC Works for Control & Substation Buildings

Scope of Works


Supply and Install galvanized steel with corrosion resistance coating and insect screen, galvanized steel frame, blade and accessories.

Stainless steel frame, blade and accessories, low leakage type, AMCA Class II (MIN.)

Client: CCC

Cleaning and Painting of 66000m3 Oil Tank in Al Tooba Oil Field

Scope of Work


Clean by sandblast for 66000 cubic metres oil tank in Al Tooba Oilfield from outside and 1.5m from inside, and then painting with 3 layers as bellow:

  1. Barriers 80: 60 Micron.
  2. Jota mastic : 150Micron.
  3. Hard top XP: 50Micron.

Client: SCOP

Supply and Installation of Scaffolds in Khor Azubair Gas Plant

Installation


Providing various  required  Scaffolding  along with required skilled manpower, Scaffolding materials. The scope will start from mobilization/ demobilization of skilled & experienced manpower, required scaffolding materials, equipment, tools & tackles to COMPANY site for erecting or dismantling of Scaffolding as per COMPANY Scaffolding procedures and permit requirements and the types of scaffolding is including but not limited to the following:

  1. Supply and install Tube and Coupler cantilever scaffolding type.
  2. Supply and Install Tube and Coupler suspender scaffolding Type.
  3. Supply and install Tube and Coupler mobile Scaffolding type.
  4. Supply and install Tube and Coupler Tower scaffolds type.

Location: Khor Azubair Gas Plant – Basra – Iraq

Client: Technip /BGC/ Shell.

Supply and Install HV Electrical Equipment

Description of Work


The installation of 11KV, 22 KV and 33KV, substations. Our services also include CT, PT & LA, isolators, gantries and towers.

Client:  JCCI/Babil

Location :  Babil—Iraq

Year of Construction: 2010 -2011.