Supply of Scaffolding Manpowers

Description of Work


Project Name : Supply Of Scaffolding Manpowers

Year : 2014

Description : Supply of Scaffolding Supervisor’s, Erection and Skilled Labor’s to IBC Project.

Location : North Romayla – Basra – Iraq.

Client : ICCB.

Piping and Equipment Insulation

Description of Work


Project name: Piping and Equipment Insulation – Badra Oil Field

Year : 2013

Description:  Provide manpower, materials, equipment and all the required for piping and equipment insulation works, for pipes (2″ to up to 48″ ) and for vessels. This project has been performed by skilled mechanicals and labors and we got a many certificates from Petrofac.

Client: Petrofac

Scaffolding – Provide and Erection

Description of Work


Project Name: Provide and Erection of Scaffolding

Year: 2013.

Description: Provide Material, Manpower, Equipment and all the required to erection and Install scaffolding in Badra Oil field – Wasit/Iraq.

Hydrotest for Rental Gas Compressor Station

Description of Work


Hydro test and Pneumatic test for rental gas compressor station – Hammar Mishrif – Basra- Iraq

Client:  BGC Shell – Iraq

Location: Hamar Mushrif/ Basra/Iraq

Year: 2013

Provision of Manpower for Badra CPF

Description of Work


Provision of welders, pipe fitters, electrical technician, instrumentation fitters, and civil labors.

 

Client:  Petrofac International (UAE) LLC .

Location:  Badra Oilfield—Waset—Iraq

Year: 2013-2014

Hydro Test and Pneumatic Test at CPF

Description of Work


Hydro test and Pneumatic test at CPF

 

Client:  Petrofac

Location:  Badra Oilfield / Waset / Iraq

Year: 2013 –2014

Flow Line and Piping System for Gas Compressor Station

Description of Work


Fabrication, welding and installing flow line and piping system will all pipe fittings at Hamar Mushrif gas compressor station Basra – Iraq

Client:  BGC Shell – Iraq

Location: Hamar Mushrif/ Basra/Iraq

Year: 2013

Cleaning and Painting of 66,000m3 Tank Farm

Description of Work


Cleaning by Grit-blasting and painting by of Tank Farm by capacity of 66,000 cubic metres at Toba Storage Tanks Complex, the work including but not limited to; erection, grit-blasting and painting by three layers with all  testing and commissioning.

Client: Scop

Owner: South Oil Company

Construction Works at Garraf Power Plant

Description of Works


Supply and Install construction and commissioning for specific as mechanical and electrical tasks  such steel structure, welding pipes, cable trays, laying cables, lighting poles and control systems.

Client: PETRONAS

Rehabilitation of Motorized Gate Valve 36″, Class 150

Description of Work


Rehabilitation of Motorized Gate Valve 36″, Class 150 which including but not limited to repair and replace the major parts such as Gate, Shaft, O-Rings as well as the hydrotest efforts and commissioning .

Client: South Oil Company