Hydrotest Services for Various Piping

Description of Work


Service agreement for the provision of Hydrotest services for various piping and pressure rating for FCP offsite well cluster-1 for Petronas Carigali Iraq Holding B.V.

Client: Petronas

Project to extend the Pipeline to isolate a Gas Station

Description of Work


Project Name: Project to extend the pipeline to isolate a gas station.

Fabrication, welding and laying pipe line with installing manifold and pipe fittings at Majnon Oilfield.

Client: Shell – Iraq

Location: Alshamea-Basra

Year of Construction: 2011 -2012

Garraf Oil and Gas Project in Nassriya (FCP)

Description of Work


Project Name:  (FCP) Garraf Oil and Gas project in Nassriya.

First Commercial and Production (FCP) Garraf Oil and Gas project in Southern Iraq. The project includes the EPC of storage tanks and the construction of piping systems, process units, LP & ATM. The current FCP Garraf project is designed for 100kbpd oil from the Mishrif formation utilizing two (2) oil processing trains of 50 kbpd capacity each.

Client: Lakeshore Toltest Corporation

Location: Garraf Oilfield / Nassrya / Iraq

Year of Construction: 2011 – 2012

Construction of 22,000m3 Tank Farm

Description of Work


Construction and management of Tank Farm by capacity of 22,000m3, the work including but not limited to fabrication, erection, welding, testing, grit-blasting and painting by three layers with all  testing and commissioning.

Painting Layers as following

  1. Barriers 80: 60 Micron.
  2. Jota mastic : 150Micron.
  3. Hard top XP: 50Micron.

Client: Leakshore

Owner: Petronas-Garraf Oil Field

Majnon Pipe Line – Majnon Field Basra, Iraq

Project Name : Majnon Pipe Line – Basra- Iraq

Description of work : Fabrication, welding and laying pipe line and pipe fittings at Majnon Oilfield – Basra – Iraq

Client:  Shell – Iraq

Location :  Majnon Oilfield – Basra – Iraq

Year of Construction: 2011 -2012

 

Al–Shefaa Electrical Power Cable Project

Description of Work


Installation of a new electrical network by: Supply & installation of an over head line 200 circular & 38 lattice steel poles. Supply & installation of 10 transformers (Capacity 250KVA) with accessories

Client:  Mott MacDonald

Location:  Basra—Iraq

Year of Construction: 2012 -2013

Kut Sewerage Network Project

Description of Work


Kut Town is a cultural and traffic center in Wasit. It is under rapid development these years, and the original drainage facilities are unable to meet the demand of economic development. Its present drainage system has the following defects: imperfectness, small service area, not matched drainage pipeline network, and imperfect management, etc.

The project will make of over 90 percent of urban life sewage and industrial wastewater. The project includes rehabilitation work on rain water networks to prevent flooding during winter.

Project Details

The main items include sewage drainage works (foul and rain water), and corresponding auxiliary works. The total length of sewage pipeline network DN200~DN1500 is 145,682m; the total length of rainwater pipeline network DN300~DN1800 is 93,026m; the total length of foul pipeline network in the total investment of 64.5 billion Iraqi Dinar = 53750000 USD. The project is financed by Ministry of Municipalities and Public Works (General Directorate for Sewerage) and supervised by Ministry of Industry & Minerals (Specialized Institute for Engineering Industries); the scheduled completion period is 36 months.