Description of Work
Service agreement for the provision of Hydrotest services for various piping and pressure rating for FCP offsite well cluster-1 for Petronas Carigali Iraq Holding B.V.
Client: Petronas
Service agreement for the provision of Hydrotest services for various piping and pressure rating for FCP offsite well cluster-1 for Petronas Carigali Iraq Holding B.V.
Client: Petronas
Project Name: Project to extend the pipeline to isolate a gas station.
Fabrication, welding and laying pipe line with installing manifold and pipe fittings at Majnon Oilfield.
Client: Shell – Iraq
Location: Alshamea-Basra
Year of Construction: 2011 -2012
Project Name: (FCP) Garraf Oil and Gas project in Nassriya.
First Commercial and Production (FCP) Garraf Oil and Gas project in Southern Iraq. The project includes the EPC of storage tanks and the construction of piping systems, process units, LP & ATM. The current FCP Garraf project is designed for 100kbpd oil from the Mishrif formation utilizing two (2) oil processing trains of 50 kbpd capacity each.
Client: Lakeshore Toltest Corporation
Location: Garraf Oilfield / Nassrya / Iraq
Year of Construction: 2011 – 2012
Construction and management of Tank Farm by capacity of 22,000m3, the work including but not limited to fabrication, erection, welding, testing, grit-blasting and painting by three layers with all testing and commissioning.
Painting Layers as following
Client: Leakshore
Owner: Petronas-Garraf Oil Field
Project Name : Majnon Pipe Line – Basra- Iraq
Description of work : Fabrication, welding and laying pipe line and pipe fittings at Majnon Oilfield – Basra – Iraq
Client: Shell – Iraq
Location : Majnon Oilfield – Basra – Iraq
Year of Construction: 2011 -2012
Installation of a new electrical network by: Supply & installation of an over head line 200 circular & 38 lattice steel poles. Supply & installation of 10 transformers (Capacity 250KVA) with accessories
Client: Mott MacDonald
Location: Basra—Iraq
Year of Construction: 2012 -2013
Supplying and install 4 units of water treatment for Hay Al Hussain Water Project in Basrah , capacity of each unit is 400 m3/h
Client: Basra Water Directorate
Location: Basra – Iraq
Year of Construction: 2008 – 2009
Line Polyethylene Water Pipeline Network in the 14 Tamoz Street, size 500mm and 450mm.
Client: Basra Water Directorate
Location: Basra, Iraq
Year of Construction: 2009 – 2010
Supplying and install 4 unit of water treatment for Shat Al Arab Water project in Basrah, each unit capacity is 400 m3/h.
Client: Basra Water Directorate
Location : Basra – Iraq
Year of Construction: 2007 – 2008
Kut Town is a cultural and traffic center in Wasit. It is under rapid development these years, and the original drainage facilities are unable to meet the demand of economic development. Its present drainage system has the following defects: imperfectness, small service area, not matched drainage pipeline network, and imperfect management, etc.
The project will make of over 90 percent of urban life sewage and industrial wastewater. The project includes rehabilitation work on rain water networks to prevent flooding during winter.
The main items include sewage drainage works (foul and rain water), and corresponding auxiliary works. The total length of sewage pipeline network DN200~DN1500 is 145,682m; the total length of rainwater pipeline network DN300~DN1800 is 93,026m; the total length of foul pipeline network in the total investment of 64.5 billion Iraqi Dinar = 53750000 USD. The project is financed by Ministry of Municipalities and Public Works (General Directorate for Sewerage) and supervised by Ministry of Industry & Minerals (Specialized Institute for Engineering Industries); the scheduled completion period is 36 months.