Project Information
Al Dar International has been contracted to do Electrical Installation for the Central Processing Facility 2 at Badra Oil Field, Iraq.
Scope of Work
The electrical installation involved the following activities:
- Development of detailed engineering as required.
- Definition of exact location of bulk equipment, cable routing, actual cable lengths,
- Location, shape and dimensions, of supports and bracket for cable trays, cables, conduit non itemized equipment, junction boxes, etc.
- Installation of the following Equipment:
- Emergency Diesel Generator, (B) H.V & L.V Switch board & MCC/Lighting/Auxiliary
- Panel, (C) Transformer/Capacitor/GIS ,( D) Battery & Charger/UPS
- Installation of the following Apparatus:
- Laying of cables for more than 1.5 million meters with all termination and glanding as required.
- Lighting fixture:
- Weather Proof/Explosion Proof, (b) Indoor (in building general purpose type)
- Push button station
- Weather Proof/Explosion Proof, (b) Indoor (in building(
- Receptacle
- Weather Proof/Explosion Proof (b) Indoor (in building general purpose type)
- Communication System – Paging and set/Amplifier/Speaker/Public Address/Computer Network
- Fire Alarm System, and other activities.